Thursday, December 07, 2006

In some ways I am glad it's winter outside

Now that the cold weather has arrived things seem to be progressing on the house. Summer is great and we love the weather but it is really hard to get motivated to do inside work. Heck I even have time to blog again....hopefully we will be able to update everyone more often in the coming months.

Kitchen update:

Everyday there is less and less to do. Right now the kitchen is 90% finished with some small details left. Over the weekend we finished the tiling and grouted the entire floor. I also replaced a large section in our maid drain pipe as it is old cast iron that had cracked.

To do:

- touch up some of my dents and dings in the drywall
- install the backsplash....which incidentially are a very nice glass subway style tile....hopefully over Christmas.
- paint ceilings and walls
- install door, window and baseboard trim
- build built in wine rack and bookshelf
- buy and install new kitchen stove...our Christmas present to each other.
- some more drywall and mudding....this is mostly connected with finishing the living room.

Living room

My current project is now the living room, I have spent the last week ripping up the old tile floor and subfloor exposing the original softwood flooring. We are about halfway done that. I have also installed our new dining room casement window, reframed the wall around it and insulated it as well. The pillar containing the mechanical for the second floor has also been framed and is ready to be drywalled.

The house has now been almost completely rewired, I have one bedroom with an old wire feeding it and one bedroom with old wires in the circuit both of which will be fixed when we begin expanding the bathroom.

To do:

- tear up rest of old floor
- patch drwall holes
- mud all new drywall (ceiling and walls, way too much)
- re-work the heating ducts to the second floor and living room
- tear down old stairs
- build new stairs
- lay down new plywood on the living/dining room floor
- install tiles in front foyer
- install bamboo flooring
- install railing and banister system
- lots and lots of little finishing details



Here are some additionla photos you might find interesting:

The beginning of the tiling process. I had to work around an opening in the floor which allowed me access to our drain pipe.






The finished product. All done tiling and grouting....I still love our stainless steel kickplate.








Here is a photo of our shared wall under the stairs to the second floor. We have added sound and fireproofing and are about ready to drywall and mud it.

One thing we are waiting on, is that we are now planning on building a trapdoor over the stairs to the basement. this would give us some more useable floor space as well as take car of any railing issues. One idea we are currently working on is to have the trapdoor lower and raise electrically with an actuator. If any one knows anything about motors and actuators as well as hydraulics please drop me a line (theroltz 'AT' yahoo 'DOT' com). We have gotten one price but it is a little out of our ballpark, we are now looking at used motors as well as other suppliers.

Monday, November 20, 2006

Kitchen - almost done

So here are some more long, long awaited photos.

The kitchen is nearing completion. Pretty much all that is left is tiling the floor and the walls/backsplash.

The concrete countertops have been lacquered now and boy did they come out nice. It really highlighted the textures and their indsutrial look.

We even are now cooking with gas. Out gas fitter came in last week and hooked us up.


All the doors are done as is all the main drywalling and mudding. A little electrical is sill left to do. We have two pendant lights that will hang over the cooktop.


Notice the kickplate? We got brushed stainless steel pieces machined to fit our cabinet base and boy do they rock.
We'd love to hear your thoughts...more photos to follow shortly, I promise.

Monday, September 25, 2006

2 countertop down and one to go

Well now that fall is here and the weather is getting colder, we are a little more motivated to get things done. We are hoping that the kitchen will be done by mid October but then again I'm fairly busy with work and Ultimate.

We have nearly finished building the concrete countertops. After that we will need to do some finishing work to them such as; filling the air gaps with a dark black slurry and then covering the countertops with several coats of a natural epoxy. The epoxy is used to protect the countertops from water stains.

I am very thankful for the help I got from Robin and his son, Brent (my neighbour) and my Ultimate team. Each piece probably weights around 350 pounds.

Things left to do in the kitchen:

- countertops
- cabinet doors
- put down 3/4 inch sub-flooring
- tile and grout kitchen floor
- tile kitchen wall
- install gas for cooktop (hiring a professional)

The concrete countertop form - reinforced



The pour - its upside down



The finished product with the cooktop



The kitchen sink section

Monday, July 24, 2006

Summer brings to many distractions

Sorry for the lack of posts again. Unfortunately things are moving slowly as there are so many distractions in July.

Here are some photos.














































Sunday, June 11, 2006

Lots of photos today

Today (Sunday) turned out to be very productive. Mel's parents came over and lent us a hand with our front garden and cleaning up our backyard. I spent the day putting in our new French garden doors and boy does it look great.

We ordered the doors last Tuesday from Home Depot and scheduled the delivery for Friday. On Friday I opened up the door cavity expecting that the door would arrive at any point. Boy was I wrong, in fact in never showed. I spent most of the late afternoon on the phone trying to get the issue resolved, one guy even told me that they would send it out on Saturday. Lucky for me I had some plywood here so I could board up the opening.

Saturday morning I called early to check on the door as we would be out all day playing frisbee. Well guess what, they knew nothing of it. I finally demanded to speak with the store manager. Thankfully he resolved the issue and got us the door later that afternoon and he refunded us our delivery fee.

So with the door delivered, I spent the morning installing it. The installation went very easy as I have done this sort of thing a few times. The kitchen is really taking shape now. I also spent some time sanding my 2nd coat of mud. That means this week I will do a 3rd coat, some more sanding and maybe a 4th coat to make sure it all looks great.

Mel and her parents really did a great job with the garden. Her mom Jacqueline is great with plants and brought a bunch of flowers for us from her own garden. We finally have a very respectable front yard which should make our neighbours much happier. It beats the junkyard that used to be there. Mel's dad Don filled our garbage bin up as well. In fact our 30 yard bin is completely filled and we still have a shed full of garbage bags. Looks like we will need another bin but a least the yard doesn't look like the set from Sanford and Son.

We have also ordered our cedar for the deck the we will be doing. It should be in sometime next week. I am hoping to get the undercarriage done this week and/or weekend. The undercarriage will be done with pressure treated lumber as it will not be seen by anyone and the PT helps prevents rot as these areas have little air flow.

Thursday, June 08, 2006

sorry, sorry for the lack of posts.

Sorry I haven't posted in a while. Not a lot has changed, the house is still under construction. One good thing is that Mel has finished her last exam (Architecture). She managed to do 10 exams in about 10 months. Pretty soon she'll be a full blown architect, she should be getting her final results in August or September.

Well the kitchen is still a work in progress. The drywall is all up and I am in the midst of mudding it. Once again I owe Robin big for coming over to help. Tonight I finished the second coat, however I am really taking my time so that it all comes out looking great.

A while back I got bored and tore down our little cold room (off the kitchen). So it's now gone and will soon be replaced by a new deck. The plan is to build a wrap around deck (L shaped). I even ordered the cedar today. In fact I think our priority might be to get the deck done. Who needs a kitchen in the summer when you can BBQ.

Tomorrow we take delivery of our new French garden door. I can't wait to see how the kitchen will look with it in.

We have also finally gotten a garbage bin in. Now we can start cleaning up our yard and keep the neighbours happy.

Hopefully I will get back into posting again and be able to show you some finished work for a change.

Tuesday, May 23, 2006

Ready for the ceiling drywall

Just a quick update tonight and no photos....sorry.

We have pretty much everyhting done in the kitchen except for drywal on the ceiling. Once I get some help with the 4 sheets I have to put up I will be able to start mudding.

I spent the weekend finishing the strapping and the drywall on the walls. Nothing to exciting here.

Mel and I sorted out our lighting plan for the kitchen. I have a bit of electrical still to do. We are installing pot lights so I will pre-wire the ceiling to make everything easier after the ceiling drywall is up.

I also built the bases for our kitchen cabinets. I am using 2 x 6 as a base in order to support the weight of the concrete countertops. One good thing about getting the bases done is it allows us to easily visualize the layout of the kitchen.

Hopefully later this week I can sucker...err...get a friend over to help with the remaining drywall.

Tuesday, May 16, 2006

No big changes from yesterday...just a bit closer to being done

Today I managed to get a fair bit done despite a very sore back. The weird thing is that sitting at my desk hurts far more than actually doing physical work.

I managed to get most of the drywall done, except for a small section where I ran out of insulation and the pillar by the framed in chimney, there I have to install a heating duct to the second floor. Hopefully tomorrow I will pick up some more insulation and will then finish off drywalling the 3 walls.

I also started putting the strapping on the ceiling. I am using 2 x 4 as they are the right thickness allowing the kitchen ceiling to now match up with the living and dining room ceiling. It will be a nice continuous flow.

Derl stopped by and we think we have a plan to fix some of the plumbing and to remove a pipe or two. See the top picture, it's the pipe that is currently emptying into the yellow bucket in the right hand corner.

By fixing the plumbing this will allow me to have a pillar that is narrower and thus allows a better view into the kitchen from the living room. The pillar will also balance nicely with the pillar in the half wall near the front door. We will paint them both with a colour that accents them well.

My biggest concern in building a pillar around the chimney is that it would protrude into the kitchen to much and throw of the look a bit. In order to minimize the depth of the pillar I turned the 2 x 4 studs flat and 'tapconed' them into the actual chimney.

Hopefully tomorrow I will get the chance to pick up some more supplies and get most or the remaining drywall and insulating done. Hopefully on the weekend Robin will be able to swing by and help me install the ceiling drywall. After that it's mud time. Wait till you see what we are going to do with the backsplash and end wall.

Monday, May 15, 2006

An unproductive weekend

Well I didn't quite get as much done this weekend as I would have liked. At least I have a good excuse, or at least a reasonably good one. This weekend marked Mel's 30th birthday so a bunch of us went out for dinner on Friday and then we hit the town. For some strange reason I was very unmotivated to get anything done on Saturday and Sunday was not much better.

Monday evening proved to be pretty productive and the kitchen has taken another big step towards being done.

I built a new pillar that now encloses our chimney and hosts a new heating duct for one of the second floor bedrooms. Unfortunately the bricks from the fireplace are in poor condition as they have been nailed into many times during the life of the house and have crumbled a bit. That and the fact that we want to keep the amount of finish material (bamboo, black tile and concrete) to a minimum has forced us to cover the chimney with drywall.

I also managed to insulate the 2 exterior walls with fiberglass pink insulation and then added a vapour barrier and some accoustic sealant. The rest of the house may not be insulated but at least the kitchen will be warm.

In the above photo (showing the insulated and vapour barriered shared wall) you can see some additional bracing I installed in order to handle the weight of our Ikea kitchen cabinets.

Next I started drywalling. I can install two horizontal sheets before I drywall the ceiling which means I can get most of the kitchen done on my own. I am hoping that by the end of the upcoming long weekend I will have the ceiling drywalled as well.

Tomorrow Derl comes over to inspect our plumbing. I am hoping he will have the time to do some work for us. We need to reroute the bathroom sink vent, remove another pipe (fingers crossed that it is not being used any longer) and get the kitchen sink plumbing ready for the new sink and fridge.

Wednesday, May 10, 2006

It's taking shape...sort of.

The last two days have been tough, the weather has been so nice that it's hard to get motivated to work inside. The good news at least for me being productive is that the weather is supposed to be ugly for the next 3 or 4 days.

Tuesday I started to frame in the rough opening for the new French doors. The plan will be to drywall up to the edge of the door for now. In another week or two we will start the demo of the cold room and that is when I will install the new door. Once again I put in a header to deal with transferring the weight from the wall above. On both of the exterior walls I also screwed the existing exterior sheeting into the studs. This has helped ensure a much stronger and more rigid structure....my walls no longer flex. I also now know why our windows don't lock well, they have been bent by the weight of the house and are now curved so the locks no longer align...exactly the reason why the header is so important.

Wednesday I built a bulkhead around the plumbing that is exposed in the ceiling of the kitchen, this plumbing is for the bathroom up stairs. The bulkhead will also house the electrical for both the kitchen and the upstairs bathroom.

I now have to deal with a plumbing vent that runs the length of the kitchen ceiling. This pipe tied into the plumbing vent for the kitchen sink. I am hoping that Derl, my plumber can get redo the vent. There are also a couple of other pipes that need to be moved.

I haven't gotten around to insulating the walls yet, maybe tomorrow. I will also need to frame around the chimney and add some 2 x 6 supports for the cabinetry.

On another note, I have just found out I have to approve the comments for them to be posted. I will keep an eye on them so feel free to post.

Monday, May 08, 2006

Baby steps

Mel and I got a good start tonight and managed to get a lot done. Hopefully if we get a few more productive evenings like this one, we might be drywalling the kitchen on the weekend.

Mel spent the evening putting in the sound and fire barrier. We are noticing a bit of difference in the amount of sound the barrier absorbs. The plan will be to hang plastic as well to help prevent the kitchen smells from next door getting into our space.

I spent the evening framing in our new window. Although it isn't here yet I framed out the rough opening so that I can just pull out the old and insert the new one. The plan is to do the same for the door as well. The new window will be much bigger, in fact it is 52" wide and 44" high. It will be at the same height as the current one but will go all the way up to the header.

Thank goodness I installed a header and framed in a proper window opening, our exterior wall was flexing in and out almost 3 inches. Now the wall is very solid and the weight of the upstairs wall and the roof is now distributed along the header.

I also managed to finish off the electrical. I installed 3 GFI outlets that will run along the countertop. That's pretty much it for the electrical all that will remain is wiring the pot lights and installing Mel's cool Erco Starpoint lights. Our pot lights are from Eureka Lighting (they are the ones with the red inset). Both of the lines are available through our buddy Dan's company Flux Lighting. Now it's up to Mel to do a lighting plan for the kitchen.

Tomorrow we frame in the door and insulate the exterior walls. If there is time I will also add some extra supports for the kitchen cabinets.

Sunday, May 07, 2006

Slowly but surely

The kitchen is slowly but surely getting there. Mel and I spent the weekend finishing the demo and cleaning the place up.

We had some issues with the floor, first layer was linoleum, under that was vinyl tiles on top of very well nailed down plywood. The guys who did the work sure didn't take any short cuts. They made sure the plywood was down and not moving, they had about 3 inch spacing between the 2 inch long nails. The problem was that below the plywood was an old oak floor. Really too bad as it would have been nice to sand and reuse the flooring but since this was the only place in the house it was used and we have already gone with bamboo, we had to rip it out. So unfortunately the ripping out of the floor took longer than expected.

After that I managed to get most of the electrical in the kitchen done. I will add some GFI outlets to the backsplash area tomorrow and that will do it for the wiring.

On Thursday I got our old fuse box removed and replaced with a new breaker panel. With the new breaker panel I can easily add new circuits myself. If anyone is looking for a good electrician, let me know and I will get you in contact with mine.

This week I am hoping that I can get the rest of the framing done, I have to add two headers (window and door) and frame out the new openings as well. The windows are ordered and should be here soon. I will also try and frame the new bulk head for the plumbing. Then it will be time to insulate and put on the vapour barrier. Once all that is done then I can start the drywalling.

Tuesday, May 02, 2006

Kitchen, part deux

Sorry that I don't have any photos to share, hopefully tomorrow or the next day. The last few days have seen me demo the kitchen. Still a good piece left to do.

I am gutting all 3 walls right down to the studs, the good thing is that there is no lathe and plaster just old planks on top of planks with drywall on top of it all. This has made things relatively easy and clean. There has also been a lot of cardboard, this is what they used a long time ago for soundproofing....I guess, makes sense to me. We did find a newspaper in the wall, it was an old Ottawa Citizen from September 14, 1933. If I get a chance I will scan a section of it and post it. It has some great headlines in it.

It was also nice to get rid of the horribly disgusting cabinets. You have never seen anything so gross, well actually, what was under them was far more disgusting. The end wall is also pretty flimsy and the window that is installed was done poorly. Its looking like I will have to come up with a way of strengthening the wall by redoing a lot of the framing. We have also ordered a new much bigger window, that along with the new double doors will really give the kitchen an airy feel. All the sunlight will also serve to open the kitchen up as well.

One good thing was that the water pipes to the kitchen sink have shut off valves in the basement. This let me demo the sink and the counter top by cutting away the pipes. It also means I won't have to call in a plumber until all the drywall and the new Ikea cabinets are installed.

I have been mentioning that I am building concrete countertops, for those who don't know what they look like or who want to learn more check out this gallery.www.concreteexchange.com This guy makes the nicest stuff around. He has even written a couple of how-to books, of which I now own one and highly recommend it. For his regular site see the side bar links. If all goes well here I might start making custom countertops on the side.

Before I go, I should also mention that we no longer have a functional kitchen. The fridge is in the dining area. The sink is gone and if we dirty dishes we now have to wash them in the bathtub...anyone want to do a dinner party this weekend?

PS. If anyone is interested in a stove, we have one for sale. The stove is a few years old and could use a little work on the enamel and one burner needs replacing, other that that it is nearly new. So if you are looking for a cheap working stove give us a shout...seriously.

Sunday, April 30, 2006

Kitchen


Sorry for the lack of posts lately, I took some time off from the renovation. Last week we were in Texas for Jane and Louie's wedding and well this week I just didn't really feel like doing much.

Texas was great, nice people and great weather. Our first day there the thermometer hit 99 degrees. Mel and I had a great time hanging out with Jane and Louie. They definitely do things big there, we ended up eating so much food. We also got to do some sightseeing we went into Dallas one day and hit Fort Worth the next. Fort Worth is quite interesting, here is a town that embraces its' cowboy heritage yet has one of the best art galleries in North America, the Kimball Art Museum. The Kimball was designed by Louis Kahn and its made completely out of concrete. It is perhaps his best piece of work, I think. If you get a chance check out more on Louis Kahn or watch the documentary 'My Architect'. The art it housed was also amazing, who'd have thought that there'd be Picassos, Rodins, Monets, Mondrians and Gaugains in Texas!

Now that I have the master mostly done I am a little more relaxed and don't feel the urgency to get something done. Today (Sunday) I started gutting the kitchen. I managed to put a good dent in and got a lot more done than I thought I could. Based on what we did today, the change is amazing the kitchen is now a whole foot wider than before and a foot taller as well. I am hoping that by the end of the week I will have it completely gutted. Once that is done I'll be working on:

- the electrical... lots of wiring to do
- insulating and soundproofing
- installing new double exterior french door.
- drywall and mudding

Once all that is done we'll start building and installing the new Ikea kitchen cabinets. After that I get to start my next fun project...building concrete countertops.

Well, keep checking back as I am once again motivated and will try to post regularly again.