We had some issues with the floor, first layer was linoleum, under that was vinyl tiles on top of very well nailed down plywood. The guys who did the work sure didn't take any short cuts. They made sure the plywood was down and not moving, they had about 3 inch spacing between the 2 inch

After that I managed to get most of the electrical in the kitchen done. I will add some GFI outlets to the backsplash area tomorrow

On Thursday I got our old fuse box removed and replaced with a new breaker panel. With the new breaker panel I can easily add new circuits myself. If anyone is looking for a good electrician, let me know and I will get you in contact with mine.

This week I am hoping that I can get the rest of the framing done, I have to add two headers (window and door) and frame out the new openings as well. The windows are ordered and should be here soon. I will also try and frame the new bulk head for the plumbing. Then it will be time to insulate and put on the vapour barrier. Once all that is done then I can start the drywalling.